Your cart
Close Alternative Icon
Dog Apparel & Accessories --Monchéri
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
Walking Long Lead 5m
WHITE WHITE
It is an extension lead that can be freely driven by dogs with smooth stretching and contraction.
You can expand and contract up to 5m.
Simple designs are used regardless of gender, and the range of dogs can be moved, so you can enjoy your usual walk.
[Notes]
* Never hold the lead part directly or wrap it around the body. There is a risk of injury.
* Before using the extension lead, make sure that the lead and collar are damaged.
In the unlikely event that the lead part or collar is cut, lock the expansion lead immediately and keep the lead away from the head.
* Please do not use it for anything other than the original application.
* If the lead gets wet, pull out the case completely, lock, and dry it completely before use.
* Please be careful about those who pass by nearby and vehicles. There is a possibility that it will lead to unexpected accidents without noticing the elasticity of the lead.
* Do not use for dogs other than adaptive size and adaptive weight to prevent accidents.
* We are not responsible for damage and accidents at the time of use.
* Size and weight may cause some errors.


Model
Toy Poodle (Brown) Wearing Size M/Weight 2kg * Large hair amount


Material: Body: ABS string: Nylon
size Vertical (cm) Side (cm) Width (cm) Weight (G) Total length (cm) Estimated weight (kg)
F 9.5 16.5 3 226 ~ Approximately 500 ~7
◆ Product image is a worn image.
The color may differ from the real thing depending on the light and angle.
◆ Please note that the description size may differ from the actual one depending on the material.
Shipping Policy

◇Shipping countries

United States
Mexico
Canada
United Kingdom
Italy
France
Spain
Germany
Australia
Hong Kong
China
Taiwan
South Korea
Singapore
Malaysia
Thailand
United Arab Emirates

In addition to the above countries, we can deliver to almost all countries.
You can select a country on the checkout page.

If you are worried about reaching your country, feel free to contact customer support.

support@moncheri.jp

Or send us a direct message on Instagram.

Our Instagram

◇Shipping Costs

Shipping costs are calculated during checkout based on weight, dimensions and destination of the items in the order. Payment for shipping will be collected with the purchase.


Shipping method

・Express Mail Service(2-6Day)
・Mail Service(6-14Days)
・Economy Mail Service(2-3Weeks)

◇Dispatch Time

Orders are usually dispatched within 3-5 business days of payment of order
Our warehouse operates on Monday - Friday during standard business hours, except on national holidays at which time the warehouse will be closed. In these instances, we take steps to ensure shipment delays will be kept to a minimum.

Refund Policy

Instead of returning items, you can contact us for a full refund. Why? Returns run counter to our emphasis on sustainability as every return has a carbon footprint.

This rule is only applicable for damaged products and the refunded money is returned in 30-60days to the customer.

After the order is dispatched and assigned a tracking number it can not be cancelled under any circumstances.

To be eligible for a full refund, please send us a picture of the item to : support@moncheri.jp

After that you can just keep the item, or you might want to donate it.

Your Recently Viewed Items